Application requirement
Configuration review
The hot pressing route is reviewed against density target, mold dimensions, pressure direction, chamber layout, hot-zone material, and the load-temperature profile.
Project verification checklist
Confirm mold dimensions, part height, and target density method.
Verify pressure direction, load, stroke, and tooling contact surfaces.
Document atmosphere, temperature uniformity, and the agreed material acceptance test.
