Application requirement
Configuration review
The P Series route is reviewed against graphite die geometry, load path, usable stroke, vacuum system, heating-zone material, cooling, and oxidation-control requirements.
Project verification checklist
Confirm preform dimensions, die sleeve, and clearance inside the usable chamber.
Verify load distribution and stroke through the complete tooling stack.
Document vacuum leakage, atmosphere limits, and the material acceptance test.